Skip to content
Industries · Manufacturing · Metal & steel

Steel manufacturing ERP for wire, mesh and metal works

Steel manufacturing ERP: steel coils stacked in a warehouse

Steel manufacturing ERP from Data Value, built on ERPNext: buy coils, sheets and bars by weight, cut them to size with the offcuts kept in stock, run each job through cutting, welding and finishing, and see the scrap and the cost of every order.

From the coil to the finished job

Materials · cutting · fabrication · cost

Steel manufacturing ERP: steel coils stacked in a warehouse
From the coil to the finished job

Materials · cutting · fabrication · cost

Materials

Coils, sheets and bars by weight, length and piece

Set up each grade and size as an item with its units. Buy by the ton, store by the kilogram and issue by the metre, sheet or piece, with the conversion done for you. Give each coil or bundle a batch number, so you know where it came from and how much of it is left.

ERPNext inventory Stock Ledger report for October, listing in and out quantities and balance per item
Stock ledger with every movement in and out, demo data.
ERPNext bill of materials form for a workstation bundle, listing three raw material items with rates and amounts
A bill of materials in ERPNext, demo data.
Cutting and scrap

Cutting to size with offcuts and scrap recorded

Each product’s bill of materials holds the steel it needs and the scrap you expect. When the shop cuts, usable offcuts go back into stock as their own items, scrap is weighed into a scrap item, and the loss shows against the order.

Fabrication

Fabrication jobs through cutting, welding and finishing

Turn each customer order into a work order. Operations such as cutting, bending, welding, galvanising and painting run as job cards on their workstations, with the time spent on each. Work you send to an outside galvaniser or painter runs as a subcontracting order.

ERPNext manufacturing work order for a workstation bundle, with its required items and source warehouses
A work order with its required items, demo data.
ERPNext quotation with three line items, a total and the KSA VAT 15% sales taxes and charges template
A quotation with line items and taxes, demo data.
Quotations and sites

Supply-only and supply-and-install quotes

Price supply-only and supply-and-install work from the same items, with labour and transport as their own lines. Accepted quotes become sales orders, and installation on site runs as a project with tasks and timesheets.

Screens show demo data from fictional companies.

Quality

Quality checks on steel in and goods out

Set inspection templates with the readings you check, such as thickness, width and coating, and record them when steel arrives and before goods leave. Rejected quantities go to a separate warehouse and stay out of usable stock.

Built on ERPNext

Running in the steel trade today

Steel wire, nails and building materials group · Saudi Arabia

A Saudi group that makes steel wire, nails and mesh and trades in building materials is a Data Value client on ERPNext.

Client names withheld: business type and country only.

FAQ

Steel manufacturing ERP: frequently asked questions

Can we buy steel by weight and sell it by length or piece?

Yes. Each item can have several units with conversion factors, so you buy by the ton and sell by the metre, sheet or piece.

Yes. Usable offcuts come back as their own items, and scrap is recorded by weight as a scrap item with its value.

Yes. Each operation has a job card with the workstation, the quantity done and the time spent.

Yes. Materials, labour and transport are lines on the same quotation, and the installation runs as a project.

Yes. A subcontracting order sends the material out and receives the finished parts back into stock with their cost.

CLIENTS IN THIS SECTOR

Metal and steel manufacturers that run on Data Value

Frappe Certified Gold Partner

Running a steel or metal works?

Tell us what you buy, cut and make. We show you a similar setup on ERPNext.