Real estate & contracting · Arabic-first, on ERPNext
From tender to handover, one workspace for contractors
Madarij takes a contractor's bid from prequalification through costing, pricing, approval and submission, then turns the awarded tender into a live project with its contract, baseline and progress certificates.
It is built in Arabic on ERPNext, so invoices, purchasing and project costs land in your accounting without re-keying.
- BOQ costing with supplier quotes
- Profit scenarios and a price waterfall
- Approval chain up to the CEO
- Progress certificates to ERPNext invoices

Who it is for
Built for the people who run it every day
- General contractors
- MEP and fit-out contractors
- Operation and maintenance contractors
- Tender and estimating teams
- Commercial managers and CEOs
- Project managers and PMO
- Document controllers
Industry
Part of ERPNext for Real Estate & Contracting
See how property, construction and tender management fit together for developers and contractors.
What you get
What you get with Madarij: Tenders & Projects
9 capabilities in 3 groups, each shown next to its screen in the real system.
Tender study & pricing
Prequalification to tender in one click
Keep prequalifications in one list and turn a qualified one into a tender.
- Track active prequalifications
- Convert a qualified one into a tender in one click
- Its data and checklist carry forward to the tender
- A stage track from opportunity to result

Tender study & pricing
BOQ requirements and cost study
Break the tender into BOQ lines, then cost each line by category.
- Quantity, commercial type, delivery method and owner per line
- Delivery in-house, by ERP supply or by a subcontractor
- Cost by category: manpower, supply, equipment, lump sum, admin
- Supplier quotes per cost item, with a confidence badge

Tender study & pricing
Pricing with profit scenarios
Choose the margin, then follow how the cost becomes the final bid.
- Minimum, competitive, target, management or custom margin
- Override the markup on any line
- Lines priced on loaded cost, including hidden overheads
- Waterfall from cost base and financing to VAT and final bid

Readiness, approval & award
Readiness gates before submission
The tender cannot be marked Ready for Submission until every gate is complete.
- Approved conditions booklet and mandatory documents
- Insurance, closed addenda and answered inquiries
- Every requirement costed and the technical proposal approved
- Tender dates shown in Gregorian and Hijri

Readiness, approval & award
Approval chain up to the CEO
Every pricing version is reviewed before the bid leaves the company.
- Technical, finance and commercial review, then the CEO
- An approval room with the full price waterfall
- Approve the final bid, or return it with a note
- Cost and selling figures hidden from roles not allowed to see them

Readiness, approval & award
Award to project automatically
Recording the award sets the project up for you.
- The project, with an ERPNext Project and Cost Center
- A draft contract with frozen original values
- A post-award checklist with an owner for each action
- Actions such as the final guarantee and contract signing

Project delivery & billing
PMO dashboard with earned value
Follow each project's progress and cost on one dashboard.
- Planned vs actual progress
- EV, AC, EAC, SPI and CPI
- Actual cost from the project's cost center in ERPNext
- A register of risks, issues, decisions and milestones

Project delivery & billing
Progress certificates to invoice
Claim, certify and invoice the work done in each period.
- Previous, current and cumulative quantities per line
- Retention, advance recovery, deductions and VAT
- A certified certificate becomes a draft ERPNext Sales Invoice
- Collection tracked from the payments against it

Project delivery & billing
Change control, documents and alerts
Keep the contract value, subcontracts and company papers under control.
- Variation orders update the contract value
- Subcontract packages from scoping to execution
- Company certificates with their expiry status
- Daily alerts for bank guarantees and overdue tasks

Screens show demo data.
Challenges vs. solutions
Common challenges, and how Madarij: Tenders & Projects answers each one
| Challenge | How Data Value solves it | Traditional approach |
|---|---|---|
| Costing a tender with many BOQ lines | BOQ requirements costed by category, with supplier quotes and a confidence badge on each cost item | One spreadsheet per estimator |
| Overheads left out of the bid price | Each line priced on its loaded cost, including its share of site staff, vehicles, insurance and head office | A rough percentage added at the end |
| Submitting with something missing | A readiness checklist blocks Ready for Submission until documents, insurance, addenda, inquiries and costing are complete | Manual checks just before the deadline |
| Getting the bid price approved | Technical, finance and commercial review, then CEO approval in an approval room, with approve or return with a note | Email chains and printed sign-offs |
| Starting the project after award | The award creates the project, an ERPNext Project and Cost Center, a draft contract and a post-award checklist | Re-entering tender data in other systems |
| Billing progress certificates | Cumulative quantities with retention, advance recovery and VAT; a certified certificate becomes a draft Sales Invoice | Separate certificate sheets and manual invoices |
| Expiring certificates and guarantees | A document center with expiry status, bank guarantee countdowns and daily alerts | Calendar reminders kept by one person |
Why Data Value
Why teams choose it
Built in Arabic
Designed in Arabic with a right-to-left layout, using the tender terms your team already uses.
Native to ERPNext
Material Requests, Projects, Cost Centers and Sales Invoices are standard ERPNext documents.
Figures for the right roles
Cost and selling figures are separate permission levels, so a role can work on a tender without seeing them.
From bid to closeout
The awarded tender becomes the project, its contract, its certificates and finally its closeout record.
Earned value on real costs
SPI, CPI and EAC use the actual cost booked to the project's cost center in ERPNext.
Approvals from a phone
The portal is responsive with a bottom navigation, so approvals, tasks and certificates work in a phone browser.
How it works
From setup to daily use
- Register the prequalification or opportunity and convert it into a tender.
- Build the BOQ requirements, cost every line with market quotes and pick a profit scenario.
- Clear the readiness gates and route the pricing version through technical, finance, commercial and CEO approval.
- Record the awardMadarij creates the project, the contract and the ERPNext project and cost center.
- Run the project with the PMO dashboard, progress certificates, invoicing, change orders and closeout.
Related
Works together with
ERPNext modules
Runs on these modules
Solutions
Related solutions
FAQ
Frequently asked questions
Does Madarij need ERPNext?
Yes. It is a Frappe app that requires ERPNext and creates standard ERPNext documents such as Material Requests, Projects, Cost Centers and Sales Invoices.
Is the interface in Arabic or English?
Madarij is designed in Arabic with a right-to-left layout. The navigation can switch to English, but most screens stay in Arabic.
Can we control who sees our costs and margins?
Yes. Cost figures and selling figures are separate permission levels, so a role can work on a tender without seeing them.
How are progress certificates calculated?
Each line carries previous, current and cumulative quantities against the contract quantity adjusted by approved variations. Advance recovery and retention are deducted before VAT.
Does Madarij connect to Etimad or issue ZATCA e-invoices?
No. Madarij does not connect to e-procurement portals and does not issue e-invoices itself; it creates draft Sales Invoices in ERPNext, where your own invoicing setup applies.
Does it work on a phone?
Yes, in the browser. The portal is responsive with a bottom navigation on small screens, so approvals, tasks and certificates can be handled from a phone. There is no separate native app.
See it with your own data
Book a demo and our team will walk you through the system and how it fits your business.
Free demo · No commitment